Am 28.01.2019 um 11:11 schrieb Edward Welbourne:
> Am 25.01.2019 um 11:08 schrieb Lars Knoll:
>>> The CI problem comes from the fact that if we have a high rate of
>>> stages to qtbase/dev, we at some point get into a deadlock situation,
>>> even if we disregard any flakiness in the system. That’s because
>>> higher rates imply that more changes are tested together. This in
>>> turn increasing the risk of rejection of all changes because of one
>>> bad change in the set. So the current system doesn’t scale and
>>> basically rate limits the amount of changes going into a branch (or
>>> worse, we end up getting traffic jams where the actual rate actually
>>> goes down to zero).
> 
> My working guess at what the present system does is that it piles up a
> staging branch with everything that gets staged while an integration is
> running; when one integration completes (with maybe some modest delay if
> the staging branch is sort), the staging branch gets its turn to attempt
> to integrate (possibly via a rebase onto a freshly-integrated branch).
> I hope someone who knows the actual process can describe it in this
> thread.
> 
> If that's reasonably close to true, the we shall indeed get many commits
> piling up in each staging branch, increasing the likelihood of failure
> in the integration attempt.  We could mitigate that in various ways by
> tweaking the process.
> 
> In particular, we could cap the length of staging branches (perhaps with
> a bit of flexibility to let in commits with the same owner as some
> already in the branch, so that groups of related changes don't get split
> up); once a staging branch hits the cap, we start a fresh staging
> branch.  This gives us a queue of staging branches, rather than just
> one, each waiting to be integrated.
> 
>>> To me this means we need to seriously rethink that part of our CI
>>> system, and ideally test changes (or patch series) individually and
>>> in parallel. So maybe we should adjust our CI system that way:
>>>
>>> * test changes (or patch series) individually
>>> * If they pass CI merge or cherry-pick them into the branch
>>> * reject only if the merge/cherry-pick gives conflicts
> 
> We could equally run several integrations in parallel and select one of
> those that succeed (probably the one that entered the staging queue
> earliest) to be the new tip; all others that succeed, plus any new
> staging branches grown in the interval, get rebased onto that and tested
> in parallel again.  That'll be "wasteful" of Coin resources in so far as
> some branches pass repeatedly before getting accepted, but it'll avoid
> the small risk you describe below.  The "speculative" integrations being
> run in parallel with the "will win if several succeed" one make the most
> of Coin having the capacity to run several in parallel - assuming it does.
> 
>>> This adds a very small risk that two parallel changes don’t conflict
>>> during the merge/cherry-pick process, but cause a test regression
>>> together. To help with that, we can simply run a regular status check
>>> on the repo. If this happens the repo will be blocked for further
>>> testing until someone submits a fix or reverts an offending change,
>>> which is acceptable.
> 
> When those events happen, they're going to gum up the whole works until
> they're sorted out; they require manual intervention, Which Is Bad.
> 
> Robert Loehning (25 January 2019 17:49) replied
>> Could that be solved by testing the combinations of changes again?
>>
>> * test changes (or patch series) individually
>> * If they pass CI merge or cherry-pick them into some local branch
>> * reject if the merge/cherry-pick gives conflicts
>> * when time period x has passed or the local branch contains y changes,
>> test the local branch
>>     good: push the local branch to the public one
>>     bad:  repeat step four with a subset of the changes it had before
>>
>> Assuming that y is significantly greater than 1, the added overhead for
>> one more test run seems relatively small to me.
> 
> IIUC, you're describing a two-stage integration process; test many
> staging branches in parallel; accumulate successes; combine those and
> re-test; if good, keep.  There shall be new staging branches coming out
> of the sausage machine while the earlier composite is going.  We have to
> work out what to do with those.  If the composite fails, these fresh
> successes can be combined and tested just as the earlier one was; but,
> if the earlier composite passes, we need to rebase the integrations that
> have passed while it was tested.  However, all these have passed
> previously, so we have fair confidence in them; so we can combine them
> all together on the prior composite and set about testing this as a
> second-stage composite integration.  So I think that has a good chance
> of working well.
> 
> A note on merge vs rebase here: when merging several branches that have
> passed first-integration, a conflict excludes a whole branch, though
> it's probably caused by one or few of the commits in the branch; whereas
> rebasing lets you detect which individual commits cause the conflicts,
> so that only these get left out.  It also gives you a linear history.
> Given that each staging branch is typically a jumble of mostly unrelated
> commits (albeit there may be a few related commits in it), these
> branches have no "semantic" relevance, so aren't valuable to keep in the
> history.  So I'd encourage the use of rebase (discarding individual
> commits when they conflict) rather than actual merges (discarding whole
> branches on conflict); either way, it's what I mean by "combine" above.
> 
> Suppose Coin is capable of running N+1 integrations in parallel; then
> we'll typically be doing one second-integration while (up to) N
> first-integrations run in parallel.  If the second-stage one wins, the
> (up to N) first-stage successes will be combined together on top of it;
> otherwise, they just get combined as they are; either way, they form the
> new second-stage integration.  This typically has a good chance of
> success (for the same reason that Lars's "small risk" is indeed small);
> but, when it fails, we haven't got ourselves into a broken state that
> gums up the works until manual intervention fixes the problem.
> 
> So, in effect, Robert's model is Lars's with one of the N+1 integrations
> it could have done in parallel being given up to do his "regular status
> check" immediately to the result of his merge and the whole merge being
> reverted if it fails.  Since we expect that to be rare, this reduces how
> many integrations we can do in parallel by one to forestall Lars's "one
> small risk" and ensure the tip is always good (Which Is Important).
> 
> So, modulo using rebase rather than merge to combine the first-stage
> successes, I like Robert's model better,
> 
> 	Eddy.
> 

Thank you, glad to hear that. But since you started with "IIUC" let me 
illustrate it:

1. The target branch is at x
2. Changes A, B, C, D, E are staged.
3. Tests are run for x+A, x+B, ...
    - x+B fails, the others pass

So far this is the same as Lars suggested, IIUC.
Lars would then proceed:

4L. Target branch is being updated to x+A+C+D+E

I suggested instead:

4R. Tests are run for x+A+C+D+E, fails
5R. Tests are run for x+A+C, passes
6R. Target branch is being updated to x+A+C

Whether this is done by merging or rebasing is a matter of taste but 
should not make a difference to the resulting code. The different runs 
in step 3 could be done in parallel if the CI allows. Step 4R could also 
be done in parallel with step 3, but that is a bit optimistic. If only 
one of the changes tested in step 3 fails, the parallel step 4R becomes 
a waste of energy.

Cheers,
Robert